Overhead cranes UAE: the MFEMT range
- Single girder overhead crane: one main beam, with a structure diagram.
- Double girder EOT crane: two main beams, with a structure diagram.
- Monorail trolley: an electric wire rope hoist running on one beam.
- Twin rail trolley with twin hoist: a trolley that carries two hoists on a twin rail.
- Lifting accessories and custom items: shackles, hooks, chains, wire ropes and slings, and spreader beams, lifting frames and main girders made to order.
A workshop manager usually knows the problem before the product. Loads get moved by forklift, the aisle is blocked, and someone is holding a steel plate with a strap. A crane or monorail over the work area puts the lift on a fixed, repeatable path.
Single girder or double girder?
Single girder versus double girder overhead cranes (typical)Read more
| Crane | Typical use | Choose it when |
|---|---|---|
| Single girder | Lighter, regular lifts in workshops and stores | Loads and spans are moderate and headroom is limited |
| Double girder | Heavier loads and longer spans | You need more capacity, or space for a hoist above the beams |
| Monorail trolley | Moving loads along one fixed track | The lift path is a straight line |
| Twin rail trolley, twin hoist | Long or awkward loads carried by two hoists | One hoist cannot balance the load |
What to decide before you ask for a crane
Information a crane quotation needsRead more
| Item | Why it matters |
|---|---|
| Capacity | The heaviest load including slings and hooks sets the size |
| Span | The distance between the runway rails sets the girder length |
| Lifting height | Decides the hoist and the headroom you need under the roof |
| How often it lifts | A crane used all day is specified differently from one used weekly |
| Runway and building | The building must carry the load, or free-standing supports are needed |
| Power supply | Hoists and travel motors need a suitable supply at the site |
Where overhead cranes help
Workshops and fabrication shops
Plate, pipe and fabricated sections get lifted dozens of times a week. A single girder crane or monorail over the bay takes that off the forklift and the floor crew.
Yards, stores and loading bays
Where crates and machinery arrive on trucks, a crane over the bay moves them straight to the shelf or machine without a second vehicle. A crane only covers the area under its runway, so a gantry arrangement may suit open yards better; gantry cranes are listed among the group's lifting services.
Supports and runway steel
If the building cannot carry a runway, steel supports and runway beams can be fabricated: see MARINA Steel Welding Workshop, the group's steel fabrication division in Sharjah.
Lifting safely
- Never lift more than the rated capacity, and include the weight of slings and spreaders.
- Lifting gear should be installed, tested and inspected by competent people under the rules that apply at your site.
- Keep people clear of the load path.
- Replace damaged slings, chains and hooks instead of repairing them.
What to send for a quote
- Capacity, span and lifting height.
- A photo or drawing of the building or structure.
- How often it will be used.
- Delivery and installation location in the UAE or GCC.
The same company also supplies winches and trailer jacks. See the MFEMT LLC overview, the services page or the contact page.




